Electricity market

Litgrid > Electricity market > Balancing market > Baltic LFC block FCR dimensioning forecast 2026-2035

Baltic LFC block FCR dimensioning forecast 2026-2035

Litgrid, together with other Baltic transmission system operators, has prepared a long-term forecast of the capacity of the Baltic LFC (Load Frequency Control) block's FCR (frequency containment reserves) for the period 2026-2035. The document can be found using the link below.