Lithuanian electricity transmission system operator Litgrid

manages electricity flows in Lithuania and maintains stable operation of the national electricity system
Watch system data
349 MW
Physical flows
349 MW
Watch system data

News

2025 November 7
Baltic electricity transmission operators announce plan to phase out balancing resources
Baltic electricity transmission operators announce plan to phase out balancing resources
The Baltic electricity transmission system operators – Litgrid in Lithuania, Elering in Estonia, and Augstsprieguma tīkls (AST) in Latvia – have announced a plan to discontinue the provision of demand reduction resources. In order to ensure the reliability of electricity system in the event of a lack of supply in the balancing market, Baltic operators were granted the right to consider their own resources or those of related service providers.
 
 
Read
2025 October 15
Litgrid delivers a fourth autotransformer to Ukraine – enough capacity to power a quarter of a million people
Litgrid delivers a fourth autotransformer to Ukraine – enough capacity to power a quarter of a million people
Lithuania’s electricity transmission system operator Litgrid has delivered a fourth high-voltage autotransformer to Ukraine. The equipment will help restore and strengthen the country’s war-damaged electricity transmission network. With a capacity of 200 MW, the autotransformer is sufficient to supply electricity to more than 250,000 people.
 
 
Read
2025 October 7
The first commercial battery storage system in Lithuania has joined the electricity balancing market
The first commercial battery storage system in Lithuania has joined the electricity balancing market
A new participant has joined the electricity balancing market organized by Litgrid, the Lithuanian electricity transmission system operator, and submitted its first bids – a 1 MW power and 2 MWh capacity energy storage battery system, built by Green Genius in the Alytus district. This is the first commercial storage facility in the country to contribute to ensuring the balance between electricity consumption and production in the Lithuanian electricity system.
Read
2025 October 1
Litgrid to increase electricity transmission capacity with Poland, invites market participants for consultation
Litgrid to increase electricity transmission capacity with Poland, invites market participants for consultation
Lithuanian electricity transmission system operator Litgrid has prepared a concept for increasing transmission capacity between Lithuania and Poland, which is presented to the market participants. It is expected that the implementation of the measures outlined in the concept will increase cross-border electricity transfer capacity. The growth of electricity trade will create better conditions for the development of renewable energy sources in Lithuania.
Read
2025 September 19
Litgrid dismantled all cables connecting the Lithuanian and Kaliningrad electricity systems
Litgrid dismantled all cables connecting the Lithuanian and Kaliningrad electricity systems
Litgrid, the Lithuanian electricity transmission system operator, has completely dismantled the sections of cross-border power lines connecting Lithuania with the Kaliningrad region. Once the entire infrastructure has been dismantled, the owners of the vacated land will be able to use their plots without any restrictions.
 
 
Read
2025 September 12
Litgrid launches the recruitment process for new Chief Executive Officer
Litgrid launches the recruitment process for new Chief Executive Officer
As the current CEO’s five-year term draws to a close, Litgrid, a subsidiary of the EPSO-G, new  energy group, has opened a public recruitment process for the role of Chief Executive Officer.
Read